Home / Our Inspection Work / CGF Pre-Shipment Inspection for Parallel Flow Tube Bundles
Pre-Shipment (PSI)

CGF Pre-Shipment Inspection for Parallel Flow Tube Bundles

CGF Pre-Shipment Inspection for Parallel Flow Tube Bundles
Service Overview

Sourcing parallel flow tube bundles used for heat exchangers, HVAC, refrigeration and cooling systems from China factories? CGF Inspection provides reliable Pre-Shipment Inspection (PSI) before shipment and container...

Sourcing parallel flow tube bundles used for heat exchangers, HVAC, refrigeration and cooling systems from China factories? CGF Inspection provides reliable Pre-Shipment Inspection (PSI) before shipment and container loading.

Pre-Shipment Inspection will be arranged when over 80% of production is finished and goods are ready for delivery. Our inspectors carry out random sampling according to recognized AQL standards to comprehensively assess quality consistency of finished tube bundles.

Complete Parallel Flow Tube Bundles Inspection Checklist

Quantity & Specification Verification

Count finished goods quantity, confirm part model, serial marking match purchase order and technical specifications.

Dimensional Measurement Check

Test tube length, OD, wall thickness, bending radius, hole position spacing and overall assembly dimension, verify tolerance compliance.

Surface Visual Inspection

Check aluminum tube surface for scratches, dents, black oxidation, sharp burrs, twist, flattening and irregular forming.

Welding & Connection Inspection

Examine welding joints for uniform bead, no crack, porosity, cold solder and assembly gap that may cause leakage risk.

Leakage Performance Witness Test

On customer request, witness air tightness test and hydraulic pressure test to ensure no leakage under working pressure.

Protection & Export Packaging Audit

Check plastic protective film, foam padding, anti-rust treatment, wooden pallet stability, moisture-proof packing and printed shipping marks.

Full English Inspection Report

After on-site inspection, you will receive complete report including dimension data, defect photos, testing records and overall quality judgment.

Avoid defective goods being loaded into container. Arrange pre-shipment inspection for your parallel flow tube bundles with CGF Inspection.

What We Check

  • Visual & workmanship inspection against your approved AQL
  • Functional and safety testing on sampled units
  • Key dimensions and specifications vs the signed sample
  • Quantity verification — cartons, units and assortment
  • Packaging, inner/outer carton, labeling and barcode checks
  • On-site photography and, where needed, carton-drop or smell tests

When To Book This Service

  • Finished goods are 80–100% produced and at least 80% packed
  • Before you release the final balance payment to the factory
  • For a new supplier, a new product, or any high-value order

How CGF Conducts It

  • We agree the AQL level (General II, normal) and sample size with you
  • A local CGF inspector visits the factory on the confirmed date
  • Checks cover appearance, function, measurement and packing
  • All findings are photo-documented on site
  • A detailed English report is sent within 24 hours

Why It Matters

  • Catch defects before the goods leave China — far cheaper than returns
  • Protect your final payment until quality is verified
  • Avoid rejected shipments, chargebacks and brand damage
  • Get independent evidence for any supplier dispute

Industries We Cover

Electrical & ElectronicsHome & BuildingToys & GiftsFurniture & FurnishingsGarments & TextilesFootwearBeauty & CosmeticsPackaging Materials

Where We Operate

Zhejiang, Jiangsu, Shanghai, Guangdong (Dongguan / Shenzhen / Foshan / Shunde), Qingdao, Sichuan, Chongqing and across China.

We apply internationally recognised standards for every assignment.
StandardWhat it covers
AQL (Acceptance Quality Limit)Defines the maximum number of defective units acceptable in a random sample — the basis of our sampling plans.
ANSI/ASQ Z1.4U.S. standard for sampling by attributes (single, double and multiple sampling).
ISO 2859-1International general standard for sampling by attributes, equivalent to ANSI/ASQ Z1.4.
ISO 9001Quality management system baseline referenced in our factory audits.
IEC / EN / ASTMProduct-specific safety & performance references applied per your specification.

Every CGF assignment includes

  • An independent, on-site inspector working for you — never the factory
  • Internationally recognised AQL sampling (ANSI/ASQ Z1.4 · ISO 2859-1)
  • On-site photos embedded in every report
  • A detailed, bilingual English inspection report within 24 hours of the visit